Electrical & control panels
We are an electrical control panel manufacturer in Pakistan building MCC, PCC, PLC, VFD, PFI and ATS panels for fertilizer, oil & gas, power, sugar, textile and food plants. Every panel is built to your drawings, fully tagged and tested in our workshop before it reaches site.
Panels we build
A plant is only as reliable as the panels that feed and control it. A loose termination, an undersized busbar or an unlabelled wire turns a five-minute fault into a lost shift. We design and build panels so your electricians can find any circuit from the drawing in seconds. As a control panel builder in Rahim Yar Khan, we deliver across Punjab, Sindh and the rest of Pakistan.
- MCC panels — motor control centres with DOL, star-delta, soft-starter and VFD feeders, withdrawable or fixed.
- PCC panel and LV distribution — incomers with ACBs or MCCBs, busbars sized for fault level, metering and outgoing feeders.
- PLC panels — Siemens and Allen-Bradley PLCs with I/O, power supplies, network switches and marshalling terminals. See our PLC programming service.
- VFD panels — drives with line reactors, filters, cooling and bypass where needed. See VFD & motor control.
- PFI capacitor panels — automatic power factor correction with detuned reactors for plants with drives.
- ATS and synchronising panels — automatic transfer between grid and generator, and generator synchronising for plants that live with load-shedding.
How a panel job runs
1. Drawings and BOQ
We start from your single-line diagram, load list or BOQ. If you do not have drawings, we prepare them: single-line diagram, control schematics and panel layout, for your approval before anything is cut.
2. Build and tagging
Panels are built with proper wire sizes, ferrules on every core, cable tags, labelled terminals and engraved nameplates on every feeder and push button, so the panel matches the drawing exactly.
3. Workshop testing
Before dispatch we check continuity and insulation resistance, prove every control circuit, and test PLC and VFD functions with simulated inputs. You are welcome to witness the test.
4. Installation and commissioning
On site we install and level the panel, lay and terminate cables on cable tray, carry out loop checks and commission with your operators.
What you receive
- Single-line diagram, schematics, panel GA and terminal drawings, updated to as-built.
- Cable schedule and I/O list in Excel.
- Test report from the workshop and site.
- Spare parts list with part numbers.
FAQ
Straight answers to what plant owners and engineers ask us most.
What types of electrical panels do you build?
We build LV distribution boards, motor control centres (MCC), power control centres (PCC), PLC and VFD control panels, power factor improvement (PFI) capacitor panels, and ATS and generator synchronising panels for industrial plants in Pakistan.
Do your panels come with drawings and wire tagging?
Yes, every panel. You receive the single-line diagram, control schematics, panel general arrangement and terminal drawings, and every wire carries a ferrule that matches the drawing. Drawings are updated to as-built after commissioning.
Are panels tested before delivery?
Yes. Each panel is wired and tested in our workshop: continuity and insulation checks, control circuit function tests, and PLC and VFD tests where fitted, before it is dispatched to site.
Can you upgrade an old panel instead of replacing it?
Often yes. We can replace worn contactors and breakers, add a PLC or VFD, add PFI capacitors or re-wire to current standards while keeping the enclosure, which saves cost and downtime.
Why does a PFI panel matter in Pakistan?
Distribution companies charge industrial consumers for low power factor. An automatic PFI capacitor panel keeps power factor high, which avoids those charges and reduces current in cables and transformers.
Machine down or planning an upgrade?
Send us the PLC model and the problem. We reply within one working day.
